Download Print this page

Chapter 4: Installation And Threading - Signode LITTLE DAVID LX600 Operator's Manual

Advertisement

Installation and Threading
A
Section 1: Placing the Machine
The labeler comes fully assembled and already on the mounting
stand. The Plant Manager at your facility might have already
determined a pre-arranged location for the labeler. If no pre-
arranged location exists following the steps below will help
determine the ideal spot.
and skid. There are three lag bolts fastening the labeler to the base of the skid.
While the machine is fully assembled, certain options such as software or
spare parts kits may be packaged separately.
lways check for any signs that the machine may have been damaged
before fully removing it from the shipping skid.
Step One:
Carefully remove all of the items in the shipping box
4
Chapter

Advertisement

loading

Related Products for Signode LITTLE DAVID LX600