Download Print this page

Kodak HEALTH SCIENCES MINILOADER 2 Plus Low Voltage Stand-Alone Installation Instructions Manual page 5

Hide thumbs Also See for HEALTH SCIENCES MINILOADER 2 Plus Low Voltage Stand-Alone:

Advertisement

INSTALLATION INSTRUCTIONS
6.
Place the PROCESSOR PLINTH (the PLINTH is symmetrical, it can be either way round) in position
under the STAND. Roll the MINILOADER STAND away and install the FLOOR PLATES supplied
with the PROCESSOR under the LEVELLING FEET, and level the PLINTH leaving a gap of
approximately 25 mm between the floor and the bottom of the PLINTH. See FIGURE 2.
Figure 2
January 1995
Figure 1
15 mm
Screw for height
adjustment
Processor plinth
Page II-5
Miniloader
Stand
25 mm
II 3420
© Kodak Ltd.

Advertisement

loading