Connection To The Electric Network - Saeco Lavazza Omnia 120V Operation And Maintenance

Table of Contents

Advertisement

US English
5.3
Connection to the Electric
Network
This operation must only be
performed by specialised
technical personnel or by
the service provider.
The
Technician,
charge of the appliance's
installation, shall make sure
that:
• the power supply system complies with the safety
instructions in force;
• the voltage corresponds to that indicated on the appliance
data plate.
In case of doubt, do not
proceed
installation and ask qualified
and authorised personnel
to accurately check the
system.
Do not use adapters or
multi-sockets.
Make sure that the power
cord
plug
reachable after installation.
20
Maintenance
who
is
in
with
the
is
easily

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Supo48rf

Table of Contents