Unfold Procedure - Snorkel SL26 Series Parts And Service Manual

Table of Contents

Advertisement

4. Close the latch gate.
5. Remove nuts, bolts and washers from the top of the rear guardrail. Fold the rear guardrail down
onto the platform being careful to keep latched at all times.
6. Remove nuts, bolts and washers from the top of the side guardrails. Lift up and fold one side
guardrail in resting it on the deck. Repeat with other side guardrails.

UNFOLD PROCEDURE

1. Raise side guardrails, making sure each is pushed down to secure the guardrail in the vertical
position.
2. Install bolts, washers and nuts between the side guardrails, tighten securely.
3. Raise rear guardrail assembly, aligning holes and install bolts, washers and nuts. Tighten se-
curely.
LH EXT. PLATFORM
HANDLE
Figure 2-6: A view of the platform handle locations and fold directions.
SL26/30SL
!
D A N G E R
Before entering platform, guardrails must be securely fastened in the
upright position (safe working position).
!
W A R N I N G
DO NOT use the work platform without guardrails properly assembled
and in place.
RH EXT. PLATFORM
HANDLE
OPERATION
!
!
Page 2 - 15

Advertisement

Table of Contents
loading

This manual is also suitable for:

30sl seriesSl30slSl26slSl26-01-060105Sl30-01-060210

Table of Contents