6. Operation

6.1.7. Electric Steam Generator for the Slimsorba (Optional Equipment)

In the electrically heated version, the Slimsorba is also equipped with an integrated
steam generator (2).
To prepare the steam generator (2) for operation, perform the following jobs in the order given:
1.
Remove screw-in plugs (8) and (9).
2.
Open aeration valve (10).
3.
Fill 4.5 l (1.2 US gal) water in filler stub (7).
4.
Replace screw-in plugs (8) so that they seal tightly.
(Do not use hemp, use only PTFE tape)
5.
Close aeration valve (10).
6.
Start P48.
7.
Wait until the pressure gauge (11) display shows that the steam pressure is 5 bar.
8.
Open aeration valve (10) until steam comes out and then close the valve again.
(Caution: danger of scalding)
9.
Screw in the screw-in plugs (9) again.
10.
If the error message "E981" appears on the display, there is a lack of water in the steam
generator, which is triggered by the overheating protection (6). Let the steam generator cool
down until the pressure gauge (11) shows 0 bar.
Then refill with water, as described in steps 1 to 9.
11.
Stop program P48 after the venting and go to the next step n2 (cooling the carbon).
Start again and let the program run until the end.
Additional information:
Failure to reach the heating temperature during the desorption cycle is shown on the display as
-
"E905". Remedy this by opening the aeration valve (10) for a short time and then closing it again.
-
Switching pressure on the pressure control switch:
ON
5.0 bar
29
OFF
5.4 bar
6.