5. THINGS YOU NEED TO KNOW BEFORE PROGRAMMING
5
5 - 2
(1) Using TEST mode
(a) Operating TEST mode using the mode switch
Set the mode switch to "TEST Mode", and execute power ON or reset.
TEST mode operation is started based on the setting.
The test results are indicated by the amplifier side LED.
Table 5.3 Mode Switch Settings
Mode Switch Setting
8
9
A
After TEST mode operation is started, the test execution details cannot be
changed even if you change the mode switch.
The test results are not stored in the processing result storage area
(RWrm+3H). (CC-Link communication is not performed in Test mode.)
(b) Operating TEST mode using the sequence program
1) Set the mode switch to "RUN Mode", and execute power ON or reset.
RUN mode operation is started based on the setting.
2) Set TEST mode operation.
Set the test mode and operation details to be executed in the test operation
mode specification area (RWwm+0H).
Table 5.4 Test Operation Mode Specification Area
Set Value
0000H, value other than below
00A0H
00C0H
Point
The TEST execution contents cannot be changed after the mode has transitioned
to TEST mode, even if you change the test operation mode specification area
(RWwm+0H). Set the execution contents in the test operation mode specification
area (RWwm+0H) before transitioning to TEST mode.
3) Execute TEST mode.
When the TEST mode execution request (RYn5) is turned ON, TEST mode
operation is started based on the set conditions of the test operation mode
specification area (RWwm+0H).
Test Description
Communication test
Distance level measurement
Noise level measurement
Operation
Communication test
Distance level measurement
Noise level
5 - 2