Download Print this page

KidKraft Cedar Summit Bancroft Playhouse Installation And Operating Instructions Manual page 43

Advertisement

Step 17: Cafe Gable Assembly
Part 1
A: From outside of the assembly place 1 (0332) Cafe Roof flush to the inside edge of (0316) Roof Side with the
angled edge at the top. Top of board should align with the peak of the Roof Assembly. Attach (0332) Cafe Roof to
(0316) Roof Side with 3 (S2) #8 x 1-1/2" Wood Screws. (fig. 17.1, 17.2 and 17.3)
B: Place a second (0332) Cafe Roof flush to the inside edge of (0316) Roof Side on the other side,angled edge at
the top. Top of board should be tight to first (0332) Cafe Roof. Attach (0332) Cafe Roof to (0316) Roof Side with 3
(S2) #8 x 1-1/2" Wood Screws. (fig. 17.2 and 17.3)
C: Measure 1-1/4" in from the peak of the 2 (0332) Cafe Roofs then attach 1 Corner Bracket to both boards with 3
(S13) #6 x 5/8" Pan Screws. (fig. 17.3 and 17.4)
Fig. 17.2
0377
Wood Parts
2 x
Cafe Roof 5/8 x 4-1/4 x 28-3/4"
0332
0316
S2
0332
Fig. 17.4
Corner Bracket
6 x
3 x
Tight
0377
0332
Note: Angled edge at top.
0332
1-1/4"
0332
Hardware
#8 x 1-1/2" Wood Screw
S2
#6 x 5/8" Pan Screw
S13
43
Fig. 17.1
Fig. 17.3
0332
S13
x 3
Other Parts
1 x Corner Bracket
S2

Advertisement

loading

This manual is also suitable for:

Cedar summit p280080z