•
• Make sure the impeller is free of any obstacles.
•
•
Prior to commencing any maintenance or repairs , make sure the ventilation units is disconnected from the power source.
6.7.
HEATER MAINTENANCE
•
•
•
•
• If necessary, electric heater can be removed. Disconnect the electrical connector from the heater and remove the heater.
6.8.
CONTROL BOARD MAINTENANCE
•
• Open the cover of the product.
•
• Remove the control box cover.
•
• Remove control board.
•
and connector to corresponding connection terminal and connector.
RIRS 400-700 V EKO 3.0 v2020.1
EN |
15