YASKAWA V1000 Installation Manual page 26

Hide thumbs Also See for V1000:
Table of Contents

Advertisement

5 Installation Procedure
9.
Reattach the bottom cover. Keep the ground wire inside of the bottom cover when
reattaching.
Figure 12
V1000
IP20/Open-Chassis
10.
On models CIMR-VBA0006 to BA0018, 2A0008 to 2A0069, and
4A0001 to 4A0038, reattach the terminal cover.
Refer to
Figure 13
BA0018, 2A0008 to 2A0020, and 4A0001 to 4A0011, which require
routing the ground wire through the provided notch when reinstalling the terminal
cover.
26
Figure 12 Reattach the Bottom Cover
and
Figure 14
for drive models CIMR-VBA0006 to
YASKAWA ELECTRIC TOBP C730600 60C V1000 Option SI-EN3/V Installation Manual
IP20/NEMA Type 1 Enclosure

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Si-en3/v

Table of Contents