Kioti DK4210(C)HSE Manual page 137

Table of Contents

Advertisement

(1) top link
(2) top link bracket
(3) snap pin
(4) top link hook
7. install the top link to the top link
hole of the implement. loosen the
lock nuts of top link and turn the
top link handle to adjust the length
of it as needed. Align the pin holes
for top link and top link hole on the
implement to insert the set pin.
insert the snap pin into the set pin
hole securely to hold the set pin.
TD210-미국법인향-DK4210,4710,5310,6013 3
h61o616A-2
(1) implement support
8. raise up the implement by posi-
tion control of tractor. remove the
implement support as needed.
Align the implement by adjusting
the length of the check chains on
both sides. tighten the lock nuts
on the check chain securely.
9. Adjust the tip angle of implement by
adjusting the length of top link. tight-
en the top link lock nuts securely.
3-point hitch implement And loAder operAtion
10. Adjust the balance of implement
by adjusting the length of lift rod
(rh). tighten the turn buckle
lock nut of lift rod (rh) securely
afterward.
h61o608A
6
3
-
5 6
2018-03-30 오후 6:41:25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dk4710(c)hseDk5310(c)hseDk6010(c)hse

Table of Contents