User Manual
GFK-1503F
Chapter 4:
This chapter describes:
•
Installing the CPU
•
Installing the power supply
•
Installing additional modules
•
Activating or replacing the backup battery
•
Serial port connections
•
Installing expansion modules
•
Ethernet connection for CPUE05
•
CE Mark installation requirements
System installation instructions, which give guidelines for carrier, power supply, and
module installation, as well as information about field wiring and grounding, are located in
the VersaMax Modules, Power Supplies, and Carriers Manual, GFK-1504.
4.1
Mounting Instructions
All VersaMax
section of 7.5mm X 35mm DIN rail, 1mm thick. Steel DIN rail is recommended. The DIN rail
must be electrically grounded to provide EMC protection. The rail must have a conductive
(unpainted) corrosion-resistant finish. DIN rails compliant with DIN EN50022 are preferred.
For vibration resistance, the DIN rail should be installed on a panel using screws spaced
approximately 15.24cm (6 inches) apart.
The base snaps easily onto the DIN rail. No tools are required for mounting or grounding to
the rail.
Figure 20
4.1.1
Removing the CPU from the DIN Rail
1. Turn off power to the power supply.
2. (If the CPU is attached to the panel with a screw) remove the power supply
3. Slide the CPU along the DIN rail away from the other modules until the connector
Installation
Installation
TM
modules and carriers in the same PLC "rack" must be installed on a single
module. Remove the panel-mount screw.
disengages.
Chapter 4
Jan 2020
31