®
For Tethered Open and Closed Loop Legs
1.
Install the plastic covers in the two (2) places, per leg, as shown.
2.
Place the worksurface flush with the front face of the leg (2a).
Flush the edge of the leg with the side of the worksurface (2b).
Install twenty-six (26) #10-10 x 1" wood screws per leg (2c).
3.
Tethered worksurfaces need to be leveled both front to back &
side to side. Perform leveling by adjusting the glides.
2c
FLUSH
2a
1
FLUSH
2b
939500590 Rev F
Page 5 of 8
Need help?
Do you have a question about the FrameOne and is the answer not in the manual?
Questions and answers