®
For Panel-Mounted Open and Closed
Loop Legs (cont.)
3.
Install the plastic covers in the four (4) places, per leg,
as shown.
4.
Place the worksurface flush with the front face of the
leg (4a). Flush the edge of the leg with the side of the
worksurface (4b). Install twenty-six (26) #10-10 x 1" wood
screws per leg (4c).
5.
Worksurfaces need to be leveled front to back.
(Assuming the panel has already been leveled side to
side.) Perform leveling by adjusting the glides.
4c
3
3
RH
FLUSH
4a
3
LH
FLUSH
4b
Page 4 of 8
939500590 Rev F
Need help?
Do you have a question about the FrameOne and is the answer not in the manual?
Questions and answers