T Urn Power Off; Connect The Battery - HySecurity SWINGSMART-DC Quick Start Steps

Advertisement

v
erify the
C
OnneCt the
t
P
Off
urn
OWer
Turn OFF AC power at the source
DANGER
(circuit breaker panel) before
accessing the wires in the SwingSmart junction box.
Make sure both the DC and AC power switches are
in the OFF position.
Place the power switches in the
OFF position.
Service Outlet
DO NOT connect the
WARNING
115VAC service outlet to
208 or 230VAC power supply wires! To use
the 115VAC service outlet on a 208 or
230VAC installation, the electrician needs
to run an extra neutral wire to the operator
from the power source and wire the service
outlet per cover.
115VAC wires for the
Service Outlet
Junction
box cover
and label
C
OnneCt the POWer WireS
1. Unscrew the two Phillips-head screws.
2. Remove the cover to the junction box.
3. Connect the AC power and ground wires with
wire nuts.
Wiring of gate operators must conform to NEC
CAUTION
standards and comply with all local codes.
Page 6
D0324 Rev D
P
Off,
OWer iS
W
ireS
Junction box
SwingSmart DC Quick Start Steps
and then
If power input
is 208/230V, move
the switch so 230V
appears and change the
label on the junction box.
CAUTION
switch on the AC power board must be moved to the
230V position or damage to the operator will occur
and void the Limited Warranty.
C
b
OnneCt the
Connect the red battery wire.
Voltage selector switch is
factory set to 115V.
When connecting to 208/230VAC on
the AC power, the voltage selector
© 2013 www.hysecurity.com