Operator Placement & Gate Arm Geometry for 90° Gate Opening
Short Gate Installation:
For gates up to 10 feet (3 meters)
X
Y
Xg
A
14"
23.5"
15.5"
36cm
60cm
39cm
10.5"
18"
27.5"
17.5"
27cm
46cm
70cm
44cm
20"
29.5"
19"
51cm
75cm
48cm
Medium Gate Installation:
For gates up to 13 feet (4 meters)
X
Y
Xg
A
22"
33"
21"
56cm
84cm
53cm
12"
24"
35"
22"
31cm
61cm
89cm
56cm
28"
39"
24"
71cm
99cm
61cm
Operator Placement & Gate Arm Geometry
for 100° through 130° opening
Degree of swing
X
Y
100
20"
24"
51cm
61cm
110
26"
24"
66cm
61cm
120
32"
20"
81cm
51cm
130
38"
18"
97cm
48cm
Gate bracket
i
g
nStall
ate
b
raCket and
l
a
inkage
rmS
Install the gate bracket and
set linkage arm geometry
based on the dimensions
shown in the chart above.
Turn OFF AC power at the source
DANGER
(circuit breaker panel) before
installing the SwingSmart operator. Follow facility
Lock Out / Tag Out procedures. Make sure both the
DC and AC power switches on the Control Box
are in the OFF position. Refer to step 10.
www.hysecurity.com © 2013
O
– a
PeratOr
hartS fOr
Long Gate Installation:
For gates up to 20 feet (6 meters)
B
X
Y
Xg
21.5"
30"
44"
55cm
76cm
112cm
24.5"
15"
35"
49"
62cm
38cm
89cm
124cm
26"
40"
54"
66cm
102cm
137cm
Custom Gate Installation:
B
X
Y
Xg
29"
X + Y - 1
74cm
30.5"
Space for
78cm
custom
calculations
33.5"
85cm
Xg
A
B
36"
24"
36"
91cm
61cm
91cm
39"
28"
40.5"
99cm
71cm
103cm
41"
31.5"
44"
104cm
80cm
112cm
44"
36"
47.4"
112cm
91cm
121cm
Maximum A = 38" (97cm)
Maximum B = 47" (121cm)
Xg
B
SSemble
m
Ount the
O
PeratOr
A
B
Junction
28"
38.5"
box
71cm
98cm
30.5"
42.5"
78cm
108cm
Ground
lug nut
33.5"
48.5"
85cm
118cm
A
B
0.63 * Xg 0.87 * Xg
g
Grounding rod depth at
10' (3m) or per local code.
National Electric Code (NEC) requires a separate earth
ground in addition to the required equipment ground. A local
earth ground also serves to protect the electronic controls.
X
Linkage arms
A
SwingSmart DC Quick Start Steps
g
a
ate
rm
Ground wire
to chassis
Concrete pad
depth per
local code
O
rOund the
PeratOr
The potential for lightning discharge exists
DANGER
with all gates, fences and gate operators.
Y
Stub arm
D0324 Rev D
½ x 3½"
concrete
anchors (4)
Taper
clamp
Page 3

Advertisement

loading

This manual is also suitable for:

Swingsmart-dc-20Swingsmart dc