Putting The Machine Into Operation; Safety Instructions; Putting The Machine Into Operation For The First Time; Running-In Period - Wacker Neuson Dumper 5001 Operator's Manual

Table of Contents

Advertisement

Operation
3.4

Putting the machine into operation

Safety instructions

Putting the machine into operation for the first time

Running-in period

3-8
• Use footholds and handles 28 to access and leave the machine
• Never use control elements as handles
• Never get on or off a moving machine! Never jump off the machine
Important information
• The machine may be put into operation by authorized staff only
– see chapter 2.5
Staff Qualifications and Basic Responsibilities on page 2-4 and
– see chapter 2.6
Safety instructions regarding operation on page 2-4 of this Operator's
Manual.
• The staff must have read and understood this Operator's Manual before putting the
machine into operation.
• The machine may only be used in serviceable condition in accordance with its
designated use and the instructions set forth in the Operator's Manual, and only by
safety-conscious persons who are fully aware of the risks involved in operating the
machine.
• Go through the "Start-up" checklist in the following chapter.
Handle the machine carefully during its first 50 operating hours.
The future performance and service life of the machine are heavily dependent on the
observance of the following recommendations during the running-in period.
• Do not overload the machine, but at the same time do not drive too cautiously either, as
the machine will never reach its proper operating temperature.
• Do not run the engine at high rpm for extended periods.
• Increase the load gradually while varying the engine speed.
• Strictly observe the maintenance schedules in the appendix
Maintenance plan (overview) on page 5-35
– see chapter 5.14
BA 5001-6001 US – Edition 1.2 * 6001b320.fm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dumper 6001

Table of Contents