Disassembly - Toro Reelmaster 5500-D Service Manual

Hide thumbs Also See for Reelmaster 5500-D:
Table of Contents

Advertisement

Disassembly

1. Remove external components as described in the
following sections:
Shaft Seal Replacement
Trunnion Seal Replacement
Check/High Pressure Relief Valve Replacement
Charge Pressure Relief Valve Replacement
Heat Exchanger By-Pass Valve Replacement
Filter By-Pass Valve Replacement
In-Line Filter Check Valve Replacement
Charge Pump Replacement
2. Remove six (6) screws securing the center section
to the housing. Note position of longer and shorter
screws. The cylinder block springs will cause the center
section to separate from the housing (Fig. 39).
IMPORTANT: The pump and motor cylinder blocks
may stick to the valve plates and center section. Be
careful to prevent damage to the sealing surfaces.
3. Remove center section from housing (Fig. 40).
4. Remove gasket and two (2) alignment pins from
housing.
IMPORTANT: Be careful not to damage valve plate
and center section surfaces.
5. Carefully remove valve plates from center section. It
may be necessary to pry valve plates off with a small
screwdriver (Fig. 41).
6. Remove valve plate pins from the center section
(Fig. 42).
Reelmaster 5500-D
Page 4 - 53
Figure 39
Figure 40
Figure 41
Figure 42
Hydraulic System (Rev. C)

Advertisement

Table of Contents
loading

This manual is also suitable for:

00075sl

Table of Contents