Toro Reelmaster 5500-D Service Manual page 37

Hide thumbs Also See for Reelmaster 5500-D:
Table of Contents

Advertisement

8. Connect fuel hose to the rear injector nozzle (Fig.
30).
9. Connect wires and/or electrical connections to the
following electrical components:
A. Glow plug bus (Fig. 30). High temperature shut-
down switch (Fig. 29).
B. Battery, frame, and wire harness ground to the
engine block and the ETR solenoid (Fig. 28).
C. The temperature sender (Fig. 27). The oil low
pressure switch, starter, and alternator (Fig 26).
10.Connect air filter hose to the engine.
11. Connect coolant hoses to the water pump, radiator
cap, and engine block. Make sure radiator drain is shut.
Fill radiator with coolant (see Check Coolant System).
12.Secure yoke flange to the lower fan belt pulley with
three socket head screws and lock washers (Fig. 25).
A. Apply Loctite 242 or equivalent to the threads of
the screws.
B. Torque screws from 30 to 35 ft-lb (41 to 47 N-m).
C. Lubricate yoke slip tube (see Lubrication in Chap-
ter 2 - Product Records and Maintenance).
13.Connect both battery cables to the battery (see Bat-
tery Service in Chapter 5 - Electrical System).
14.Adjust throttle cable (see Adjust Throttle Cable).
15.Bleed fuel system (see Bleed Fuel System).
16.Close engine hood.
Reelmaster 5500-D
3
1
1. Cable swivel
2. Cable clamp
3. Fuel hoses (separator)
1. Cap screws
Rev. C
Page 3 - 21
6
2
Figure 31
4. Fuel hose (fuel tank)
5. Injection pump
6. Fuel pump
1
2
Figure 32
2. Fan shroud
Kubota Diesel Engine
5
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

00075sl

Table of Contents