Section 6: Hqlc Installation - CommScope FD21206-48SRC Series Installation Manuallines

Table of Contents

Advertisement

Technical Publication

Section 6: HQLC Installation

1
Remove dust cap from pendant assembly by pulling back on red
safety lock-ring. Rotate connector collar nut counter-clockwise
and pull back. Remove Qty. 4 white ferrule dust caps. DO NOT
remove caps from ports not being used.
Warning: DO NOT touch or place anything into power pins when
site is powered up.
2
Remove dust cap from jumper assembly by pulling back on red
Safety lock-ring. Rotate connector collar nut counter-clockwise
and pull back. Pull forward on the dust cap. Remove Qty. 4 white
ferrule dust caps.
Locate the alignment keys on the HQLC connector and the
pendant. Insert the connector straight into the port making sure
the keys are aligned correctly. Push until front seal is fully under
adapter housing.
3
Engage the collar nut at pendant and twist clockwise ¼ turn until it stops and "click" is heard or felt. Slide
the red safety lock-ring up and under the collar nut. Install a 20cm x 4.5mm UV rated cable tie for additional
security. Collar nut should not be able to rotate once installed. Support jumper within 152 mm (6 in) from the
back of the connector. Verify the unused caps are tight before leaving the site as they provide the weather
seal for the connector.
UV rated cable tie for
additional security
Warning: The female end of the connector attached to
the pendant are not field removable. Do Not attempt
to remove with wrench.
www.commscope.com
+
-
Lock
Collar
Ring
Nut
Lock
Ring
152 mm
(6 in)
Bulletin # 7843672
Fibers
Collar
Nut
Dust
Cap
Rev. B
Alignment
keys
Power
sockets
Be careful during final routing
to avoid placing unwanted
stress on the assembly
+
11

Advertisement

Table of Contents
loading

Table of Contents