Section 9: Fe-16148-Ovp-B12 Junction Box Wiring Diagram - CommScope FD21206-48SRC Series Installation Manuallines

Table of Contents

Advertisement

Technical Publication

Section 9: FE-16148-OVP-B12 Junction Box Wiring Diagram

Grounding to the integral OVP is
mandatory. A 2 to 6 AWG weather-
able conductor should be run as
straight and short as possible to an
adequate grounding point to per-
form properly. (contractor supplied)
OVP window will be green on
the initial position, the window
will be red after a surge trips
Power Conductors
Ground / Alarm
Ground / Alarm
Wire
Wire
Alarm wire is
Alarm wire is
connected to
connected to
the green alarm
the green alarm
The power labels can be lost if the length is significantly reduced during
terminal
terminal
www.commscope.com
Seal the fiber box lid with provided E20 Torx screw with E4 security
pin head (Qty 4) to the torque value range: 11.52 +1/-0 Kgf.cm
OVP
Terminal Blocks:
Torque value range:
1.5 – 1.8 Nm
(13.3 – 15.9 in lbs)
Hybrid Trunk
Power cords are labeled per sector
installation. Always re-label conductors before cutting off excess.
Bulletin # 7843672
Trunk Fiber Connections
Jumper Fiber Connections
Trunk Power Connections
Jumper Fiber Connections
Dome Nut Torque value range: 6 +/-.5 Nm (53 +/- 4 in lbs)
Rev. B
13

Advertisement

Table of Contents
loading

Table of Contents