The operator of the system must:
prepare a risk assessment
identify and demarcate corresponding hazard zones
carry out safety training
secure the system against unauthorised use.
Person
1)
Operating company
Technical expert, (familiar with,
understands operating instructions)
Technical specialist, (technical
worker, per installation instruc-
tions and execution standards)
Electrical specialist VDE 0105
(per regulations for electrical
safety, or per national equivalents)
1) Operation and assembly work may only be carried out by persons who are 18 years of age.
2.3
Intended use
The system is used as a draining system for faecal and faecal-free, domestic and industrial wastewater, installed in an
accessible KESSEL chamber system of differing heights and designs.
Observe regional and local municipal regulations - maximum wastewater temperatures (e.g. 35°C) are often stipulated,
amongst other things.
All conversions or attachments that are carried out without the express and written permission of the manufacturer, the use
of non-genuine spare parts and repairs carried out by companies or persons not approved by the manufacturer will lead to a
loss of warranty.
2.4
Product description
The system has been designed for pumping off faecal and faecal-free wastewater. The system tank houses the pump(s)
and the level sensor(s) (technical module). The assemblies are matched to the KESSEL control unit supplied. The system is
delivered with different pumps.
Control
The system starts up automatically through the control unit. For this, the control unit processes the signals from level mea-
surement.
This system uses pressure sensors for level measurement as standard. Pumping is activated when the defined fill level has
been reached. Pumping is ended after the fill level has fallen again by an appropriate amount.
If two pumps are connected, they are switched on either individually or together, depending on the fill level and positioning of
the level measurement.
Design
The system comprises the technical module and chamber module.
The technical module (system tank/base section) houses the pump(s) and the level measurement. Different chamber ele-
ments of the engineering chamber (010-701) can be mounted on the technical module (chamber module). Technical module
and chamber module together make up the system.
010-695_02
Approved activities on KESSEL systems
Visual check, inspec-
tion, change of battery
Emptying, cleaning
(inside), functional
check, configuration
of the control unit
Pumping station / Installation and operating instructions
Installation, replace-
ment, maintenance
of components,
commissioning
Work on electri-
cal installation