Duty Cycle; Low-Frequency (50/60 Hz) Leakage Current; High-Frequency (Rf) Leakage Current - Covidien ForceTriad Service Manual

Energy platform
Hide thumbs Also See for ForceTriad:
Table of Contents

Advertisement

Performance Characteristics

Duty Cycle

Under maximum power settings and rated load conditions, the system is capable of
operating a duty cycle of 25%, defined as 10 seconds active and 30 seconds inactive, in
any mode for a period of 4 hours.
Caution
Use of duty cycles greater than 25% (10 seconds active followed by 30 seconds inactive) increases
the risk that heat build-up under a return electrode may be high enough to injure the patient. Do
not continuously activate for longer than one minute.

Low-Frequency (50/60 Hz) Leakage Current

Enclosure source
current, ground open
Source current,
patient leads, all
outputs
Sink current at high
line, all inputs

High-Frequency (RF) Leakage Current

Bipolar
RF leakage
current
Monopolar
RF leakage
current
LigaSure leakage
4-8
< 300 μA
Normal polarity, intact ground: < 10 μA
Normal polarity, ground open: < 50 μA
Reverse polarity, ground open: < 50 μA
Mains voltage on applied part: < 50 μA
< 50 μA
Measured with leads
recommended by Covidien
< 59.2 mA RMS
< 150 mA RMS
< 132 mA RMS
Measured directly at the system
terminals
< 59.2 mA RMS
< 100 mA RMS
< 100 mA RMS
ForceTriad Energy Platform Service Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents