Performance Characteristics
Duty Cycle
Under maximum power settings and rated load conditions, the ForceTriad Energy Platform
is capable of operating a duty cycle of 25%, defined as 10 seconds active and 30 seconds
inactive, in any mode for a period of 4 hours.
Caution
Use of duty cycles greater than 25% (10 seconds active followed by 30 seconds inactive) will
increase the risk that heat build-up under a return electrode may be high enough to injure the
patient. Do not continuously activate for longer than one minute.
Low Frequency (50/60 Hz) Leakage Current
Enclosure source
current, ground open
Source current, patient
leads, all outputs
Sink current at high
line, all inputs
High Frequency (RF) Leakage Current
Bipolar RF
leakage
current
Monopolar RF
leakage
current
LigaSure
leakage
9-8
< 300 μA
Normal polarity, intact ground: < 10 μA
Normal polarity, ground open: < 50 μA
Reverse polarity, ground open: < 50 μA
Mains voltage on applied part: < 50 μA
< 50 μA
Measured with leads
recommended by Covidien
< 69.2 mA RMS
< 150 mA RMS
<132 mA RMS
Measured directly at the
system terminals
< 69.2 mA RMS
< 100 mA RMS
< 100 mA RMS
ForceTriad Energy Platform User's Guide