Taking Out Of Service; Short Interruption; Long-Term Interruption; Shutdown Of Device - Walther Systemtechnik SMS-18-EH Assembly Instructions Manual

Handpen
Table of Contents

Advertisement

Rev. 1.1

7 Taking out of Service

7.1 Short Interruption

A short interruption (15 min or more) has to be followed by a fine spraying.
IMPORTANT
Please follow the operating instructions!

7.2 Long-term Interruption

The following has to be observed for a long-term interruption of the device/machine:
Depressurize material supply lines
Take off air cap (2) and clean nozzle (5) with a special thinner and a soft cloth. Make sure that no cloth
fibers are left on the nozzle tip.
IMPORTANT
Please follow the maintenance guidelines!

7.3 Shutdown of Device

The following is important for a shutdown of the machine / device:
Clean Handpen with a special thinner.
IMPORTANT
Please follow the maintenance guidelines!

8 Maintenance and Repair

8.1 General Information

The handpens of the SMS-18-EH series are high-quality precision devices which will not fail if treated
correctly and will operate almost maintenance-free. Always keep clean and observe minimum instructions to
maintain a long life of the valve. Always use clean and filtered material only. The control air must also be
clean and should be slightly oiled, if necessary. Maintenance also depends on the individual operating
conditions and the type of media used
CAUTION
Before starting any maintenance or repair work, ensure that all air-operated tools are
depressurized and disconnected from the air supply.
Before opening the dosing pen it must be disconnected from the air and fluid supply.
Otherwise, ejected components can cause injuries.
Assembly Instructions - Handpen SMS-18-EH
Walther Systemtechnik GmbH – D 76726 Germersheim
Telefon: +49 (0)7274-7022-0 Telefax: +49 (0)7274-7022-91
http://www.walther-2000.de – info@walther-2000.de
Page 11 of 19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sms-18-eh-0.3Sms-18-eh-0.5Sms-18-eh-1.0

Table of Contents