System Construction (Branch Box System) - Mitsubishi Electric PUMY-P250YBM Technical & Service Manual

Split-type, heat pump air conditioners
Hide thumbs Also See for PUMY-P250YBM:
Table of Contents

Advertisement

2-2. SYSTEM CONSTRUCTION (BRANCH BOX SYSTEM)

Outdoor unit
Capacity
Number of units
Applicable indoor unit
Total system capacity range
Branch box that can be connected Number of units
Model type
Model name
Wall mounted
MSZ-EF·VG-E2
MSZ-EF·VGK-E1
MSZ-AP·VG(K)
MSZ-AP·VG(K)-E2/E7
MSZ-LN·VG2
MSZ-FH·VE2
Floor standing
MFZ-KT·VG
Note: The lineup of a connectable indoor unit depends on a district/areas/country.
Branch box
PAC-MK54BC
Number of branches
(
)
Indoor unit that
(MAX. 5 units)
can be connected
2-branch pipe (joint): Optional parts
In the case of using 1- branch box
In the case of using
2 or 3 branch boxes
Option
Optional accessories of indoor units and outdoor units are available.
OCH760
50 to 130% of outdoor unit capacity
Connectable indoor unit lineup
P15
P18
PAC-MK34BC
5-branches
3-branches
(MAX. 3 units)
Model name
MSDD-50AR-E
MSDD-50BR-E
Select a model according to the connection method.
10HP
P250YBM
kW unit: Type 15 to Type 50
2 to 12 units
(14.0 to 36.4 kW)
o
1 to 3 units*
* The maximum total capacity of the units that can be
connected to each branch box is 20.2kW
P20
P22
P25
P35
P42
Note:
A maximum of 3 branch boxes can be connected to 1 outdoor unit.
No need
Connection method
flare
brazing
7
12HP
P300YBM
50 to 130% of outdoor unit capacity
(16.8 to 43.5 kW)
o
P50
P60
P71
P80

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents