Remove the (2) M3x8 SHCS inside the
bypass.
NOTE: Drill two 3/32" fuel drain holes in the
bottom of the bypass. Drill one near the
tailpipe. Drill the other hole below the center
of the turbine.
Bypass Preparation
Drill the (4) marked turbine mount spots
with a #20 drill bit.
Press in the (4) supplied blind nuts.
BVM ® 2018
Bandit Evo
Assembly & Operation Manual
14
02/27/2018
Need help?
Do you have a question about the Go Fly Gold Bandit Evo and is the answer not in the manual?
Questions and answers