Bypass Preparation - BVM Go Fly Gold Bandit Evo Assembly And Operating Manual

Table of Contents

Advertisement

Remove the (2) M3x8 SHCS inside the
bypass.
NOTE: Drill two 3/32" fuel drain holes in the
bottom of the bypass. Drill one near the
tailpipe. Drill the other hole below the center
of the turbine.

Bypass Preparation

Drill the (4) marked turbine mount spots
with a #20 drill bit.
Press in the (4) supplied blind nuts.
BVM ® 2018
Bandit Evo
Assembly & Operation Manual
14
02/27/2018

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Go Fly Gold Bandit Evo and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents