Tape off and scuff the aft inside portion of
the bypass
Apply (3) coats of BVM Heat Shield to the
inside of the bypass.
Note: A heat gun can be used to speed up
the drying process in between coats.
Install the bypass, Turbine and tailpipe.
The Bypass Cover is secured on the flanges
by (4) #2 Socket head wood screws.
BVM ® 2018
Bandit Evo
Assembly & Operation Manual
15
02/27/2018
Need help?
Do you have a question about the Go Fly Gold Bandit Evo and is the answer not in the manual?
Questions and answers