3. INSTALLATION

INSTALL NEW SHUT-OFF VALVE
For supply installation, refer to the instructions packed
with the supply stop.
Locate the supply shut-off valve so it is 7-1/4" above the
floorline, and 4-1/8" to the left of the centerline of the
closet flange.
Install new 5/16" diameter T-bolts.
INSTALL TOILET GASKET
Position the toilet upside down on padding.
Firmly attach the gasket around the toilet outlet. If you are
using a gasket with an integral plastic sleeve, position the
gasket with the sleeve facing away from the toilet.
If desired, apply a 1/4"-thick bead of toilet setting
compound around the toilet base.
NOTE: If a rag or other plug was placed in the closet
flange, remove the rag before setting the toilet.
ALIGN AND SET TOILET
Carefully align and lower the toilet over the closet flange
and T-bolts.
CAUTION: Risk of external leakage. Do not lift or
rock the toilet after placement. A new gasket must
be reapplied if you break the watertight seal.
Apply full body weight to the toilet rim to set the seal.
SECURE TOILET
Assemble the bolt cap bases, washers, and nuts on the
exposed T-bolts.
CAUTION: Risk of personal injury or product
damage. Overtightening may cause breakage or
chipping.
Hand tighten the nuts, then tighten them an additional
1/2-turn with a wrench. If the T-bolts extend more than
1/4" from the top of the nut, cut off the excess with a
hacksaw, and file the cut edges. Wipe away any residue.
Install the bolt caps.
Kohler Co., Kohler, WI
7-1/4"
12"
T-Bolts
Bolt Cap
Nut
Washer
Bolt Cap Base
3
4-1/8"
Fig. #2
Closet Flange
Fig. #3
Gasket
Fig. #4
Fig. #5
Fig. #6
AA
110282-2-
(9515)

Advertisement

Table of Contents
loading

Table of Contents