ABB MNS-Up Service Manual page 26

Hide thumbs Also See for MNS-Up:
Table of Contents

Advertisement

26
M N S - U P S E R V I C E M A N U A L
5. Miralon 2 mm is placed all over the shipping section and is stripped by tape. The tape is supported by plastic edge
protection.
!
A drying agent is required for seaworthy packing. A single packet 32 DIN is required per 3 m
Figure 5-07
Seaworthy packing procedure, steps 4 & 5
6. The shipping section is sealed in AL foil and the air is extracted. The unit is then wrapped by plastic film
to strengthen the wrap.
40%
50%
30%
Location of
humidity detector
Transport section wraped
with plastic foil
AL foil
box.
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents