C O M M I S S I O N I N G
65

Commissioning

Follow the two steps for the commissioning.
Follow the commissioning procedure as described in the MNS service manual 1TGC902040B0201 section 5.
Exception:
While performing the insulation test on the main busbar system, the fuses of the EMC boards have to be disconnected.
Follow the start-up procedure as described in the DPA 500 user manual section 6.7.