Sign In
Upload
Manuals
Brands
ABB Manuals
Industrial Electrical
MNS-SG
ABB MNS-SG Manuals
Manuals and User Guides for ABB MNS-SG. We have
1
ABB MNS-SG manual available for free PDF download: Operation And Maintenance Manual
ABB MNS-SG Operation And Maintenance Manual (48 pages)
Low Voltage Metal-Enclosed Drawout Switchgear
Brand:
ABB
| Category:
Industrial Electrical
| Size: 3.36 MB
Table of Contents
Table of Contents
3
Important User Information
4
Safety Notices
4
Warning
4
1 General Information and System Description
6
System Overview
6
Component Names
6
Technical Data Table
7
MNS-SG Standard Configuration
8
Structure Description
8
Labels and Markings
8
Switchgear Lineup Label
8
Cubicle/Device Label
8
Mechanical Design
8
Section Arrangement
8
Busbar Compartments
9
Bus Phases
9
Horizontal Neutral Bus (Optional Feature)
10
Ground Bar
10
Vertical Distribution Busbar
11
Device Compartment
11
Section and Location Numbering
11
Wireways
12
Cable Compartment
12
Top Horizontal Wireway
12
Bottom Horizontal Wireway
12
Vertical Wireway
13
Seismic Structure Frame
13
2 Exhaust Plenum (Optional)
14
Install Side-Exhaust Plenum
15
Install Rear-Exhaust Plenum
16
Seismic Installation for Plenum
18
Positioning Arc-Resistant Switchgear
18
3 Packaging and Handling
19
Standard Packaging
19
Section Weight
20
Receiving
21
Unload and Move Switchgear Components
21
Loading and Transport
22
Ground Transport
22
Transport by Crane
23
Temporary Storage
24
4 Locate and Connect the Switchgear
25
Installation Location Requirements
25
Installation Guidelines
26
Section Installation Sequence
26
Install and Connect Shipping Splits
26
Position Shipping Splits
26
Connect Sections
26
Splice Horizontal Busbars
27
Splicing Ground Busbar
30
Attach Switchgear to the Floor
31
Attach Overhead Lifting Device
31
Operating Overhead Lifting Device
33
Connect Cable and Wiring
33
Install Connections - General Information
33
Direct Connections to Main Sections
36
Connect between Horizontal and Vertical Wireways
36
Connect Control Wiring between Sections
36
Connection to External Control Source (if Required)
36
Other Installation Information
36
Interruption of Installation
36
Surface Damage
36
Commission the Switchgear
36
Physical Equipment Check
36
Prepare to Energize Switchgear
37
Testing and Final Inspection
38
Energize the Switchgear
40
Energize the Main Bus
40
Final Testing
40
5 Component Operation Documents
40
6 Maintenance
41
Lockout/Tagout
41
Tighten Unit Control and Power Terminals
41
Remove/Insert Withdrawable Breaker
41
Inspect Units
41
Inspect Busbars
42
Exterior Metal Damage Repair
42
Maintenance Schedule
42
Semi-Annual Inspection
42
Annual Inspection
42
18-To-36 Month Inspection
43
10-Year Maximum Inspection
43
Eslok® Fasteners
43
Arc Flash Protection
43
7 Additional Resources
44
8 Torque Fasteners
44
Torque Table
45
9 Disclaimer of Warranties and Limitation of Liability
47
Advertisement
Advertisement
Related Products
ABB Tmax MOE T6
ABB SAHARA MAX-1
ABB SAHARA MAX-2
ABB MNS R
ABB MNS-MCC
ABB MNS-Up
ABB MNS
ABB MNS iS
ABB Welcome M M25102 C Series
ABB 2TLA030056R0000
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL