Agilent Technologies G1982-6700 Upgrade Installation Manual page 12

Hplc-chip/nanospray upgrade kit
Table of Contents

Advertisement

8. Locate the new gas distributor (part number G1964-20303). With the solid side facing the
Teflon wall, slide the new gas distributor over the new capillary. Push it on until it is flush
with the Teflon block.
G1964-20303
Gas Distributor
9. Reinstall the Teflon support block for the end plate with the stainless steel ring. Make sure
that the new gas distributor is positioned properly before reinstalling the screws. Be
careful during the reinstallation not to damage the URIM vespel union.
10. Reinstall the 4 T-20 torx screws to secure the metal ring in place.
11. Locate the two T-nut high voltage connectors (part number G1946-20111) and install them
into the Teflon block.
12. Locate two gold pan head screws (part number G1969-20148) and the new end plate (part
number G1946-20156). Install the new end plate and secure in place with the two pan head
screws. Make sure that the screws are snug but not over-tightened.
Page 12 of 33
18 July 2011

Advertisement

Table of Contents
loading

Table of Contents