Maintenance Work, Intervals; Daily Maintenance Tasks; Monthly Maintenance Tasks; Annual Test (Inspection And Testing During Operation) - EWM Picomig 180 puls TKG Operating Instructions Manual

Hide thumbs Also See for Picomig 180 puls TKG:
Table of Contents

Advertisement

6.2

Maintenance work, intervals

6.2.1

Daily maintenance tasks

Visual inspection
Mains supply lead and its strain relief
Gas cylinder securing elements
Check hose package and power connections for exterior damage and replace or have repaired by
specialist staff as necessary!
Gas tubes and their switching equipment (solenoid valve)
Check that all connections and wearing parts are hand-tight and tighten if necessary.
Check correct mounting of the wire spool.
Wheels and their securing elements
Transport elements (strap, lifting lugs, handle)
Other, general condition
Functional test
Operating, message, safety and adjustment devices (Functional test)
Welding current cables (check that they are fitted correctly and secured)
Gas tubes and their switching equipment (solenoid valve)
Gas cylinder securing elements
Check correct mounting of the wire spool.
Check that all screw and plug connections and replaceable parts are secured correctly, tighten if ne-
cessary.
Remove any spatter.
Clean the wire feed rollers on a regular basis (depending on the degree of soiling).
6.2.2

Monthly maintenance tasks

Visual inspection
Casing damage (front, rear and side walls)
Wheels and their securing elements
Transport elements (strap, lifting lugs, handle)
Check coolant tubes and their connections for impurities
Functional test
Selector switches, command devices, emergency stop devices, voltage reducing devices, message
and control lamps
Check wire guide elements (wire feed roll holder, wire feed nipple, wire guide tube) for tight fit. Recom-
mendation for replacing the wire feed roll holder (eFeed) after 2000 hours of operation, see replace-
ment parts).
Check coolant tubes and their connections for impurities
Check and clean the welding torch. Deposits in the torch can cause short circuits and have a negative
impact on the welding result, ultimately causing damage to the torch.
6.2.3

Annual test (inspection and testing during operation)

A periodic test according to IEC 60974-4 "Periodic inspection and test" has to be carried out. In addition
to the regulations on testing given here, the relevant local laws and regulations must also be observed.
For more information refer to the "Warranty registration" brochure supplied and our information regarding
warranty, maintenance and testing at www.ewm-group.com!
099-005545-EW501
17.12.2020
Maintenance, care and disposal
Maintenance work, intervals
53

Advertisement

Table of Contents
loading

Table of Contents