Equipment Set-Up And Installation - 3M ScaleGard HP Installation And Operation Instructions Manual

Reverse osmosis system
Table of Contents

Advertisement

Equipment Set-Up and Installation

See safety information regarding reducing the risk associated with property damage due to water leakage or fl ooding on page 4 prior
to set-up and installation of the system.
Equipment Location
Prior to installing the ScaleGard
Position the ScaleGard HP reverse osmosis base unit and the pressure tank in desired locations as per (Figure 1).
1. Access to feedwater, drain line connections and electrical outlet is required.
2. The ScaleGard HP System must be accessible and have at least 3 inches (7.62 cm) clearance on all sides of the system to facilitate servicing.
An additional 10" will be needed on both sides of the ScaleGard HP system to allow for the future installation of the SGHP Pre-EXP or the
SGHP RO-EXP manifolds.
3. The pressure tank should be installed within 15 ft (4.6 m) of the ScaleGard HP reverse osmosis base unit and 0.5" or larger tubing diameter is
required to complete installation.
Figure 1 — Plumbing Diagram
1/2" NPT Feed
Water Inlet
Install kit shutoff valve
(Sold Separately)
3/8" JG Outlet to drain
HF90-CL-RO (Pre-Filter)
HFRO 500 (RO Membrane)
TM
HP Reverse Osmosis System, carefully plan the installation location for all system components.
Bypass (Provided by Installer)
Pre-Filter sample valve
1/2" NPT Outlet to Equipment
NOTICE
NOTICE
Check Valve (Provided by Installer)
RO sample valve
1/2" JG Outlet to tank
Install kit shutoff valve
(Sold Separately)
Install kit Tee Fitting and
sample valve (Sold Separately)
1/2" Tank shut off valve (Comes with Tank)
Pressure Relieve Valve
(Sold Separately)
7
To Equipment
BEV140/BEV160
Post Filter
(Required/Sold Separately)
Pressure Tank
(Required/Sold Separately)
Legend
Provided by Installer
Installation Kit (PN-6841441)

Advertisement

Table of Contents
loading

This manual is also suitable for:

56291016239301623930262393036239304

Table of Contents