3M ScaleGard HP Installation And Operation Instructions Manual

3M ScaleGard HP Installation And Operation Instructions Manual

Reverse osmosis system

Advertisement

3M
Water Filtration Products
Installation and Operation Instructions for
ScaleGard
HP Reverse Osmosis System
TM
Installer: Please leave this manual with owner/operator.
Owner/Operator: Please retain for operation and future instructions.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ScaleGard HP and is the answer not in the manual?

Questions and answers

Summary of Contents for 3M ScaleGard HP

  • Page 1 Water Filtration Products ™ Installation and Operation Instructions for ScaleGard HP Reverse Osmosis System Installer: Please leave this manual with owner/operator. Owner/Operator: Please retain for operation and future instructions.
  • Page 2: Table Of Contents

    (dilute bleach solution). To reduce the risks associated with hazardous voltage: • Do not modify this product in any way. Use only 3M-approved replacement parts. To reduce the risks associated with hazardous voltage: • Do not use this product if any damage has occurred to the electrical portion of this product.
  • Page 3: Caution Statements

    WARNING To reduce the risks associated with hazardous voltage: • Remove power from product before performing maintenance or service. CAUTION To reduce the risk associated with back strain: • Follow safe lifting procedures. To reduce the risks associated with environmental contamination: • At the end of useable life, dispose of this system in accordance with applicable local regulations or laws.
  • Page 4: Parts List

    The following parts comprise the ScaleGard HP reverse osmosis system. Please unpack the contents from the product box and check to verify that all of the parts listed below are included. Should any parts be missing, please contact 3M Purification Inc. at 1-866-990-9785. Description...
  • Page 5: Feedwater Requirements

    IMPORTANT NOTES • Be sure to confirm that the feedwater falls within the limits shown below. If unsure of the feedwater quality, check with your 3M ™ Water Filtration Products distributor.
  • Page 6: Equipment Set-Up And Installation

    Equipment Set-Up and Installation CAUTION To reduce the risk associated with property damage due to water leakage: • Read and follow Instructions before installation and use of this system. • Installation and use MUST comply with all state and local plumbing codes. • Before starting installation, shut off main water supply and drain pipes.
  • Page 7 Wall Mounting the ScaleGard HP Base Unit 1. Draw a level line on the wall where the bracket is to be mounted. Hold bracket key holes on level line and mark locations for screws. 2. Install mounting screws (not included) into each of the intial key holes as shown in figure 2. Be sure to leave 1/8” to 1/4” (0.3 to 0.6 cm) space between the bottom of the screw head and the wall so that the bracket can be hung.
  • Page 8 Plumbing Connections – tank pre-settings of 40-60 psi ([276 - 414 kPa]) 1. Install feed water line to marked “Inlet” 1/2” NPT inlet connection. 2. Install RO water line from marked “Tank Outlet” to pressure tank (Sold Separately) . (Assemble and install pressure tank per instructions provided with tank.) 3.
  • Page 9: System Start-Up

    System Start Up 1. Turn ON the feedwater supply by plugging system into electrical outlet. Figure 4 (Reset Button) 2. Press reset button on top of electrical enclosure (see Figure 4). 3. Open Pre-filter flush valve to vent air from system and flush for five (5) minutes. 4.
  • Page 10: Troubleshooting Guide

    Troubleshooting Guide Problem Possible Cause Solution Notes Undersized tank for store demand Install additional storage tank capacity Contact Dealer Install RO add-on head and cartridge RO production is to low for store Contact Dealer Upgrade from HFRO 500 to HFRO 700 demand Cartridge Unit Runs Low or Out of Water...
  • Page 11: Routine Maintenance

    • The disposable filter cartridges MUST be replaced every six (6) months, at the rated capacity or sooner if a noticeable reduction in flow rate occurs. IMPORTANT NOTE: The RO cartridges have green labels and will only fit into the head on the right side of the manifold (head has a green 3M label). Shut-Off procedure: HFRO 500 Cartridges will need to be changed at least every twenty four (24) months.
  • Page 12: Limited Warranty

    3M Purification Inc. or failure to follow installation and use instructions. No warranty is given as to the service life of any filter cartridge or membrane as it will vary with local water conditions and water consumption. 3M PURIFICATION INC.

Table of Contents