Equipment Set-Up And Installation - 3M ScaleGard HP Installation And Operation Instructions Manual

Reverse osmosis system
Table of Contents

Advertisement

Equipment Set-Up and Installation

To reduce the risk associated with property damage due to water leakage:
• Read and follow Instructions before installation and use of this system.
• Installation and use MUST comply with all state and local plumbing codes.
• Before starting installation, shut off main water supply and drain pipes.
• Protect from freezing, remove filter cartridge when temperatures are expected to drop below 40 °F (4.4 °C).
• Do not install systems in areas where ambient temperatures may go above 110 °F (43.3 °C).
• Do not install on hot water supply lines. The maximum operating water temperature of this system is 100 °F (37.8 °C).
• Do not install if water pressure exceeds 125 psi (862 kPa). If your water pressure exceeds 80 psi (552 kPa), you must install a pressure limiting
valve. Contact a plumbing professional if you are uncertain how to check your water pressure.
• Do not install where water hammer conditions may occur. If water hammer conditions exist you must install a water hammer arrester. Contact a
plumbing professional if you are uncertain how to check for this condition.
• Do not use a torch or other high temperature sources near system, cartridges, plastic fittings or plastic plumbing.
• On plastic fittings, never use pipe sealant or pipe dope. Use PTFE thread tape only, pipe dope properties may deteriorate plastic.
• Take care when using pliers or pipe wrenches to tighten plastic fittings, as damage may occur if over tightening occurs.
• Do not install in direct sunlight or outdoors.
• Ensure all tubing and fittings are secure and free of leaks.
• The RO cartridge MUST be replaced every twenty four (24) months, or sooner if a noticeable increase in TDS occurs.
• The disposable filter cartridges MUST be replaced every six (6) months, at the rated capacity or sooner if a noticeable reduction in flow rate
occurs.
Equipment Location
Prior to installing the ScaleGard
Position the ScaleGard
HP reverse osmosis base unit and the pressure tank in desired locations as per (Figure 1).
TM
1. Access to feedwater and drain line connection are required.
2. The ScaleGard
TM
HP reverse osmosis system components should ideally be accessible and have at least 3 inches (7.62 cm) clearance on all
sides of the system to facilitate servicing.
3. The ScaleGard
TM
HP reverse osmosis base unit should ideally be installed within 15 ft (4.6 m) of the pressure tank and 0.5" or larger tubing
diameter is required to complete installation.
Figure 1 — Plumbing Diagram
1/2" NPT Feed
Water Inlet
Install kit shutoff valve
(Sold Separately)
Pre-Filter sample valve
3/8" Tube Out to drain
HF90-CL-RO (Pre-Filter)
HFRO 500 (RO Membrane)
TM
HP reverse osmosis system, carefully plan the installation location for all system components.
Bypass (Provided by Installer)
1/2" Outlet to tank
1/2" NPT Outlet to Equipment
Install kit shutoff valve
(Sold Separately)
CAUTION
Check Valve (Provided by Installer)
RO sample valve
Tank shut off valve (Comes with Tank)
6
To Equipment
BEV140/BEV160
(Post Filter-Sold Separately)
20 Gal.
Pressure Tank
(Sold Separately)
Legend
Provided by Installer
Installation Kit

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents