Equipment Set-Up And Installation - 3M ScaleGard HP Reverse Osmosis System Installation And Operation Instructions Manual

Table of Contents

Advertisement

Equipment Set-Up and Installation

See safety information regarding reducing the risk associated with property damage due to water leakage or flooding on page 4 prior
to set-up and installation of the system.
Equipment Location
Prior to installing the ScaleGard
Position the ScaleGard HP reverse osmosis base unit and the pressure tank in desired locations as per (Figure 1).
1. Access to feedwater, drain line connections and electrical outlet is required.
2. The ScaleGard HP System must be accessible and have at least 3 inches (7.6 cm) clearance on all sides of the system to facilitate servicing.
An additional 10 inches (25.4 cm) will be needed on both sides of the ScaleGard HP system to allow for the future installation of the SGHP Pre-
EXP or the SGHP RO-EXP manifolds.
3. The pressure tank should be installed within 15 ft (4.6 m) of the ScaleGard HP reverse osmosis base unit and 0.5" or larger tubing diameter is
required to complete installation.
Figure 1 — Plumbing Diagram
1/2" NPT Feed
Water Inlet
Install kit shutoff valve
(Sold Separately)
3/8" JG Outlet to drain
HF90-CL-RO (Pre-Filter)
HFRO 500 (RO Membrane)
TM
HP Reverse Osmosis System, carefully plan the installation location for all system components.
Bypass (Provided by Installer)
Pre-Filter sample valve
1/2" NPT Outlet to Equipment
NOTICE
Check Valve (Provided by Installer)
Blend line assembly
1/2" JG Outlet to tank
Install kit shutoff valve
(Sold Separately)
Install kit tank line
sample valve (Sold Separately)
1/2" Tank shut off valve (Comes with Tank)
Pressure relief valve
(Comes with Tank)
7
To Equipment
BEV140/BEV160/BEV190
Post Filter
(Recommended/Sold Separately)
Storage Tank
(Required/Sold Separately)
Legend
Provided by Installer
Installation Kit (PN-6841441)

Advertisement

Table of Contents
loading

This manual is also suitable for:

562910162393016239302Hfro-500

Table of Contents