Commissioning; Installation And Connection; Procedure - Miele PG 8504 Operating Instructions Manual

Commercial dishwasher for laboratory glassware and utensils
Table of Contents

Advertisement

Commissioning

Switching on
Select
language
Select
temperature unit
24

Installation and connection

Before commissioning the machine must be securely installed, and
the water inlet and drain hoses and the mains cable correctly
connected. See "Installation", "Plumbing connections" and "Electrical
connection" and the installation diagram supplied.

Procedure

During commissioning a set procedure is followed which must not be
interrupted. The display will automatically guide you through the
process.
All settings, except for selecting plumbing connections, can be
retrospectively altered via the
The settings made during the commissioning process are only
adopted after a complete programme has been run.
If the programme is interrupted or if no programme is started and
the machine is switched off, the commissioning process must be
carried out again.
Press the  button until the LED lights up.
The commissioning process starts with selecting the language.
Use the  and  arrow buttons to select the language you want
and touch OK to save.
The menu for selecting the temperature unit will then appear.
Use the  and  arrow buttons to select the temperature unit you
want and touch OK to save.
Settings 
and
Language 
deutsch
(
english (GB)
Temperature unit
°C
°F
Further settings
menus.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pg 8504 adPg 8504 adp

Table of Contents