Post-Operations Check - Eddyfi Technologies Magg 310 Manual

Magnetic inspection crawler
Table of Contents

Advertisement

 Visually inspect the vehicle and Microtracs™ to ensure that the moving parts are free of debris and
functional. Make sure the track belt is free of debris and turns freely.
 Check the tether and vehicle whips for damage.
 Ensure camera, light, and laser ports are clean.
❑ Check the reel for the following:
 Check that nothing will block movement of the level wind shuttle.
 Check that the tether has no loose, dangling coils. Dangling coils can propagate as the drum rotates
and have the potential to jump the drum. Take care of these before deploying the tether.
❑ Power up the system and check the following:
 Check for sufficient SSD drive space for recording.
 Check record directories are set.
 Test video recording.
 Test laser lines
 Test auxiliary lights.
 Test track control.
 Test camera control.

Post-Operations Check

A Post-Ops inspection should be carried out after every deployment using the following checklist:
❑ Inspect the tether for damage as it is reeled in.
❑ Visually inspect vehicle for entrained debris or mechanical damage.
❑ Test each function to ensure proper operation.
❑ Clean the system by hosing it down with water at regular line pressure. Do not pressure wash. The
tracks may be cleaned off by hosing them down while running. If the system has been used in salt
water, thoroughly rinse the vehicle with fresh water right away.
❑ Take time to pack the system properly for transport away from the worksite.
❑ Store the system in a dry environment.
Note: Ensuring the Magg™ 310 system is always stored in good working condition will minimize
deployment time for future inspections.
Document: umed018307
Source Location: C:\epdm\isleng\products\ed-magghd\manuals\umed018307.docm
Revision: A01
Created by: ST
Magg™ 310
Date: 24 Feb 2021
IPN: 3097222-A01
Page 23 of 30

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents