Piper Comanche PA-24 Service Manual page 175

Hide thumbs Also See for Comanche PA-24:
Table of Contents

Advertisement

(c) Operation in High Salt or High Humidity Environment
Item
Fuselage, Empennage,
and Wings.
Landing Gear.
WARNING: ENSURE BOTH MAGNETO SWITCHES ARE OFF (GROUNDED), BEFORE
TURNING PROPELLER. ENGINE MAY START IF BOTH SWITCHES ARE NOT OFF.
USE EXTREME CAUTION WHEN ROTATING PROPELLER BY HAND; PROPELLER
MAY KICK BACK.
Engines with more than
50 hours total time.
Engines with less than
50 hours total time.
Instruments and Wiring.
Interior.
NOTE: Do not use metallic tie downs (i.e. - chains, cables, etc.) in high salt or high humidity environments.
(d) Operation in Extreme Cold
Item
Hydraulic, Pneumatic
and Environmental.
04/01/09
PIPER COMANCHE SERVICE MANUAL
Remove floor panels and exterior
access plates; inspect for corrosion.
Inspect for corrosion and lubrication.
Each five days, pull prop through five
complete revolutions.
Each 30 days, fly aircraft for 30 minutes
or, ground run until oil temperature is in
the green arc. Avoid excessive ground run.
Each day, pull prop through five
complete revolutions.
Each 30 days, fly aircraft for 30 minutes
or, ground run until oil temperature is in
the green arc. Avoid excessive ground run.
Inspect for proper seal of cases and
corrosion.
Inspect upholstery, seat belts, seats and
rugs for corrosion and integrity.
Check all fittings and attachments for
security and leaks.
Inspection
Inspection
1D37
Inspection Interval
200 Hours.
200 Hours.
Each 5 days
and
each 30 days.
Daily
and
each 30 days.
100 Hours.
100 Hours.
Inspection Interval
First 100 Hour, then
as required.
III - INSPECTION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Comanche pa-24-250Comanche pa-24-260Comanche pa-24-400

Table of Contents