Landscape Forms Torres Installation Manual

Catenary light

Advertisement

Quick Links

Torres
Catenary light
Installation Guide
Included components
1X – threaded
plug
1X – luminaire
assembly
4X – M6 x 1
Nylon locknut
4X – M6 x 1 x 35mm
Socket hd
Cap screw
Tools Required
• Safety glasses
• 10mm wrench  
• 13mm socket and ratchet wrench
• 13mm box wrench 
• 32mm wrench
• 25mm wrench
• 3mm hex key
• 4mm hex key 
• 5mm hex key 
• Wiring tools and connectors
• Pliers
• Flat blade screwdriver
• Hanging cable, min dia. 0.25", max dia. 0.50"
ASSEMBLE WITH CARE! Pangard II Polyester Powdercoat is a strong, long‐lasting finish.  To 
protect this finish during assembly, place unwrapped powdercoated parts on packaging foam or 
other non‐marring surface.  Do not place or slide powdercoated parts on concrete or other hard or 
textured surface – this will damage the finish causing rust to occur.  Use touch‐up paint on any 
gouges in the finish caused by assembly tools.
2X – M8 x 1.25 
2X – M8 x 1.25 x 
Nylon locknut
40mm
Hex head screw
2X – tabbed
2X – cable blocks
washer
WARNING! Installer must provide strain relief to line‐in wires where they connect to light 
fixture wires. Failure to do so may cause electrical failure and will void warranty.
Landscape Forms is not responsible for site preparation. 
4X – M8 
INSTALLATION PROCEDURE:
washer
Note: The catenary luminaire ships assembled. Supporting cable and line‐voltage 
supply wires are not included.  Cable clamp is designed for Ø1/4"‐Ø1/2" cables. 
Cable glands accept supply wires between Ø0.24" – Ø0.47".
1.
Set luminaire on supporting cable. See Fig. 1.
2.
Install cable blocks, using M6 x 35mm socket head cap screws, tabbed washers 
and locknuts as shown in Fig. 1. Tighten securely. Once tightened, bend tabs 
down on washers to ensure locknuts cannot loosen.
2X – M6 x 8mm
3.
Install M8 x 40mm hex head screw, washers and locknuts to lock vertical rotation, 
Hex head
Set screw
see Fig. 2.
4.
Remove connection box cover. Retain screws. See Fig. 3. Leave lanyard and 
screws attached to prevent cover from falling.
5.
Orient luminaire in the desired position. Tighten large nut inside connection box 
to lock horizontal rotation. Install set screws on stem and tighten, see Fig. 4.
6.
Run electrical supply cable (not included) to wiring connection box and make 
wiring connections, see Fig. 5.
7.
If only one side of the connection box is needed for line‐in wires, remove the 
unused cable gland and replace with the threaded plug. Tighten securely with a 
wrench, see Fig. 6.
8.
Replace connection box cover.
Date: June 6, 2019
www.landscapeforms.com
Ph: 800.521.2546
Page 1 of 4

Advertisement

loading

Summary of Contents for Landscape Forms Torres

  • Page 1 Torres Catenary light Date: June 6, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 Included components WARNING! Installer must provide strain relief to line‐in wires where they connect to light  fixture wires. Failure to do so may cause electrical failure and will void warranty. Landscape Forms is not responsible for site preparation.  4X – M8  2X – M8 x 1.25  INSTALLATION PROCEDURE: 2X – M8 x 1.25 x  Nylon locknut washer Note: The catenary luminaire ships assembled. Supporting cable and line‐voltage  1X – threaded 40mm supply wires are not included.  Cable clamp is designed for Ø1/4”‐Ø1/2” cables.  plug Hex head screw Cable glands accept supply wires between Ø0.24” – Ø0.47”. 1X – luminaire assembly Set luminaire on supporting cable. See Fig. 1. Install cable blocks, using M6 x 35mm socket head cap screws, tabbed washers ...
  • Page 2 Torres Catenary light Date: June 6, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 M6x1 x 35mm M8 NYLON SOCKET HEAD LOCKNUT CAP SCREW M8 WASHER BLOCK M8 WASHER TABBED  M8x1.25 x 40mm  WASHER HEX HEAD SCREW M6 NYLON LOCKNUT SUPPORT CABLE   (NOT INCLUDED) Fig. 1 – Install luminaire on support cable Fig 2 – Install bolts to lock vertical  rotation Page 2 of 4...
  • Page 3 Torres Catenary light Date: June 6, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 CONNECTION  BOX COVER PLATE TIGHTEN NUT TIGHTEN WITH  REMOVE  3mm HEX KEY USING 4mm HEX KEY Fig. 3 – Remove connection box cover Fig. 4 – lock horizontal rotation Page 3 of 4...
  • Page 4 Torres Catenary light Date: June 6, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 ELECTRICAL ELECTRICAL SUPPLY CABLE SUPPLY CABLE (SUPPLIED (SUPPLIED BY BY OTHERS) OTHERS) THREADED PLUG Fig. 6 – Install threaded plug, if cable gland is not used Fig. 5 – make electrical connections PROCEDURE FOR WIRING: The Torres catenary luminaire is pre‐wired and assembled at the factory.  The  light cartridge is mounted into the head of the luminaire and will not need to be  removed during installation.  Line‐in and dimming wire leads to driver are  provided in wiring connection box. The LED cartridge is wired to the driver at the  factory.  Use of LED drivers other than the supplied unit is not recommended and  will void the warranty.  The wiring schematics reference connections in the luminaire and connector(s)  used to attach to the harness in the connection box. Connection hardware not  included. Installers are responsible for line‐in connections.  Note:  This unit is pre‐wired. All wiring connections are made inside the  WIRING DIAGRAM: Catenary luminaire connection box. The luminaire should not be disassembled. ...