Connection Of A Breakout Cable - Mitsubishi Electric Melsensor VS70 User Manual

Vision sensor
Hide thumbs Also See for Melsensor VS70:
Table of Contents

Advertisement

6.6

Connection of a Breakout Cable

This section shows the procedure for connecting a breakout cable.
For the specifications on the breakout cable, refer to the following section.
Page 25 Breakout cable specifications
Operating procedure
1.
Check that the 24 V DC power supply is OFF.
2.
Connect an I/O or a serial wire to an appropriate device (such as a programmable controller).
3.
Connect '24 VDC' (red wire) and 'GND' (black wire) of a breakout cable to the corresponding terminals on the power
supply.
4.
Connect the power and I/O Breakout cable's M12 connector to the vision sensor's PWR connector.
5.
Turn ON the 24 V DC power supply.
Precautions
• To reduce emissions, connect the far end of the breakout cable shield to frame ground.
• Before wiring I/O wires to an I/O device or adjusting the connected wires, turn OFF the power of the vision sensor.
• Cut unused wires or protect them with insulating materials. Be careful not to short-circuit with 24 V DC wires.
• Use only 24 V DC and observe the indicated polarity. Otherwise, fire or damage may result.
• The cable is designed to connect with its key aligned with the keyway of the connector on the Vision Sensor. Do not force
the connections or damage may occur.
6 SYSTEM CONSTRUCTION
6.6 Connection of a Breakout Cable
6
67

Advertisement

Table of Contents
loading

Table of Contents