Chapter 2 Planning; Installation Checklist - Emerson MicroMotion HPC010 Installation Manual

High pressure coriolis flow meters
Table of Contents

Advertisement

Installation Manual
MMI- 20032352
2
Planning
2.1

Installation checklist

If you plan to mount the meter in a hazardous area:
Make sure that the hazardous area specified on the approval tag is suitable for the
environment in which the meter will be installed.
Verify that the local ambient and process temperatures are within the limits of the
meter.
If the sensor has an integral transmitter, no wiring is required between the sensor and
transmitter. Follow the wiring instructions in the transmitter installation manual for
signal and power wiring.
If the transmitter has remote-mounted electronics, follow the instructions in this
manual for wiring between the sensor and the transmitter, and then follow the
instructions in the transmitter installation manual for power and signal wiring.
For optimal performance, install the sensor in the preferred orientation. The sensor will
work in any orientation as long as the flow tubes remain full of process fluid.
Table 2-1: Preferred sensor orientation
Process content
Liquids
Self-draining applications
Gases
Installation Manual
WARNING
HPC010
Planning
March 2020
HPC015
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Micromotion hpc015

Table of Contents