Emerson MicroMotion HPC010 Installation Manual page 19

High pressure coriolis flow meters
Table of Contents

Advertisement

Installation Manual
MMI- 20032352
4.2.4
Prepare a cable with user-supplied cable glands
Procedure
1. Remove the core processor cover using a flat-blade screw driver.
2. Pass the wires through the gland.
3. Terminate the shield and drain wires inside the gland.
4. Assemble the gland according to vendor instructions.
4.2.5
Prepare a cable with Micro Motion-supplied cable glands
Procedure
1. Remove the core processor cover using a flat-blade screw driver.
2. Pass the wires through the gland nut and clamping insert.
3. Strip the cable jacket.
4. Remove the clear wrap and filler material.
5. Strip most of the shielding.
6. Wrap the drain wires twice around the shield and cut off the excess drain wires.
Installation Manual
A. Gland nut
B. Clamping insert
Option
NPT gland type
M20 gland type
Option
NPT gland type
M20 gland type
A. Drain wires wrapped around shield
Transmitter power and I/O wiring
Description
Strip 4.5 in (114 mm)
Strip 4.25 in (108 mm)
Description
Strip all but 0.75 in (19 mm)
Strip all but 0.5 in (13 mm)
March 2020
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Micromotion hpc015

Table of Contents