Commissioning

5.1

Overview

Requirements
1. The expansion module has already been installed.
2. The expansion module and the PAC device have been connected up correctly.
Note
Check the connections.
Failure to connect up the device correctly can result in malfunctions and failure of the device.
Before you start commissioning the device, check that all connections are correct.
Note
When performing an insulation test of the entire installation with AC or DC, the device should
be disconnected before starting the test.
Open transformer circuits will result in electric shock and arc flashover.
Failure to observe this notice will cause death, serious injury or considerable damage
to property.
Current can only be measured by external current transformers. Do not use fuses for circuit
protection. Do not open the secondary circuit of the current transformers under load. Short
circuit the secondary current terminals of the current transformer before removing this
device. The safety information for the current transformers used must be followed.
Equipment Manual, 05/2020, L1V30408520AG-03
DANGER
5