Running-In Instructions - Fayat Group BOMAG BVP 10/36 Operating Instructions Manual

Hide thumbs Also See for BOMAG BVP 10/36:
Table of Contents

Advertisement

BVP 10/36, BVP 18/45
*Always follow manufacturer instructions*
BOMAG
*AAA Rent-All 225-291-1356*
5.4

Running-in instructions

The following maintenance work must be per-
formed when running in new machines or
overhauled engines:
Caution
!
During the running-in period, up to approx. 200
operating hours, check the engine oil level
twice every day.
Depending on the load the engine is subjected
to, the oil consumption will drop to the normal
level after approx. 100 to 200 operating hours.
After 25 operating hours
Change the engine oil.
l
Check engine and machine for leaks.
l
Check the valve clearance, adjust if necessary
l
Retighten the fastening screws on air filter ex-
l
haust, fuel tank and other attachments.
Retighten the bolted connections on the ma-
l
chine.
Check the vibration drive V-belts.
l
Check the oil level in the vibrator housing.
l
Maintenance
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bomag bvp 18/45

Table of Contents