Running-In Instructions - Fayat Group Bomag BPR 70/70 D Operating And Maintenance Instruction Manual

Reversible vibratory plate
Hide thumbs Also See for Bomag BPR 70/70 D:
Table of Contents

Advertisement

6.4 Running-in instructions

Maintenance – Running-in instructions
The following maintenance work must be performed when
running in new machines or overhauled engines:
NOTICE!
During the running-in period, up to approx. 200
operating hours, check the engine oil level twice
every day.
Depending on the load the engine is subjected to,
the oil consumption will drop to the normal level
after approx. 100 to 200 operating hours.
After 25 operating hours
Change the engine oil.
Check engine and machine for leaks.
Check the valve clearance, adjust if necessary
Retighten the fastening screws on air filter exhaust, fuel tank
and other attachments.
Retighten the bolted connections on the machine.
Check the vibration drive V-belts.
Check the oil level in the vibrator housing.
BPR 70/70 D
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents