Running-In Instructions; General; After 25 Operating Hours - Fayat Group Dynapac DFP11 Operating Instructions Manual

Single direction vibratory plate
Table of Contents

Advertisement

Maintenance – Running-in instructions

8.4 Running-in instructions

8.4.1 General

8.4.2 After 25 operating hours

78
The following maintenance work must be performed when running
in new machines or overhauled engines.
1.
Change the engine oil
oil" on page 83.
2.
Check engine and machine for leaks.
3.
Retighten the fastening screws on air filter, exhaust and other
attachments.
4.
Retighten the bolted connections on the machine.
5.
Checking the V-belt
belt" on page 97.
6.
Check the oil level in the vibrator housing.
DFP11
Ä Chapter 8.7.1 „Changing the engine
Ä Chapter 8.9.4 „Servicing the V-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents