IBC VX Series Installation & Operating Manual page 77

Residential condensing boiler
Table of Contents

Advertisement

Boiler
Component
c. Reassemble. Visually inspect the burner through
sight glass. Ensure the flame is stable, without
excessive fluttering. Normal flame pattern is
evenly distributed over the burner surface.
If the burner is operating improperly, remove and clean or
replace. Use a CO
combustion. See
Maximum CO on page 68
Heat
In areas of poor gas quality, there may be a build-up of
exchanger
black plaque (typically sulfur). Other fouling agents
include: airborne dust, debris and volatiles.
With the burner removed, examine the heat exchanger for
signs of contamination and clean if necessary.
Boiler Pump
Check that the pump is on in normal operation and that the
water Δ°T is reasonable for a given firing rate.
Gas Piping
Check for damage or leaks and repair as needed.
Boiler
Check consistency of any boiler treatment used, for
treatment
appropriate mixture. Chemical inhibitors are consumed
over time, lowering their density.
Verify proper operation after servicing.
Maintenance Required
analyzer to determine proper
2
Combustion test target ranges - CO2 /
for correct values.
Caution
Installers should inquire of local water
purveyors as to the suitability of their supply for
use in hydronic heating systems.
If water quality is questionable, a local water
treatment expert must be consulted for testing,
assessment and, if required, treatment.
Alternatively, water or hydronic fluid of known
quality can be brought to the site.
73
7.2.2 General boiler maintenance
Frequency
Check
Annually
Annually
Annually
Annually
Annually
Annually

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vx 110Vx 150Vx 199Ibgfsw1-0110Ibgfsw1-0150Ibgfsw1-0199

Table of Contents