Commissioning Checklist - GALLERY Classic Eco Installation Instructions Manual

Table of Contents

Advertisement

COMMISSIONING CHECKLIST

This checklist must be completed by the installer and handed to the customer for future reference.
Customer Name:
Address:
Appliance make and model:
Appliance serial number:
Commissioned by:
Company Name:
Company address:
Gas Safe register notification no.:
Site Requirements
Was the chimney checked to ensure it only serves 1 flue/fire, has no obstructions and is
continuous?
Has any debris at the base of the chimney been removed?
Have damper been removed or locked in the fully open position ensuring correct size of
flue is maintained?
If previously used for solid fuel, has the chimney been thoroughly swept?
Has the chimney been inspected prior to fitting the appliance to ensure that it is in good
condition?
Has the structure of the chimney been checked for leakage using a smoke pellet test?
(See BS5440-1 for details).
Ventilation
Does the installation require any additional ventilation requirements as detailed in this
instruction manual?
20
Telephone:
Gas Safe register no.:
Telephone:
Commissioning date:
Yes
No
Yes
No

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents